PART 2. ASSESSMENT OF PUBLIC RATIONALITY INDUSTRIAL AND TECHNOLOGICAL ILSGP

  • R. Leontiev Computer center of FEB RAS
Keywords: Integrated logistics systems of the mining industry, rationality assessment procedure, point scale method, production and technological evaluation signs of the second type classification.

Abstract

The article formulates the second part of the procedure for a step-by-step assessment using the method of a point scale of levels of social rationality of a real or developed (current, implemented, planned for implementation) integrated logistics system of the mining industry according to production and technological evaluation criteria of the second type classification.

Author Biography

R. Leontiev , Computer center of FEB RAS

D-r of econ. science, professor, Chief Researcher 

References

1. Leont'ev R.G., Arhipova Ju.A. Logistika gornogo dela (integrirovannye sistemy) : monografija..– Vladivostok : Izdatel'stvo Dal'nevost. federal. un-ta, 2021. – 200 s.
2. Gornoe delo: Terminologicheskij slovar' / Pod red. K.N. Trubeckogo, D.R. Kaplunova. – M.: Izdatel'stvo «Gornaja kniga», 2016. – 635 s.
3. Rudolf Leontiev, Alexey Barchukov and Maria Nemchaninova. Mining logistics systems: classification, identification, innovation // VIII International Scientific Conference “Problems of Complex Development of Georesources” (PCDG 2020). Volume 192 (2020). Khabarovsk, Russian Federation, September 8-10, 2020.
Published
2022-01-18
How to Cite
Leontiev , R. 2022. “PART 2. ASSESSMENT OF PUBLIC RATIONALITY INDUSTRIAL AND TECHNOLOGICAL ILSGP ”. EurasianUnionScientists, January, 44-49. https://doi.org/10.31618/ESU.2413-9335.2021.2.93.1.1553.